Visitor Centre nearly watertight!

Work on the visitor centre has continued albeit at a slightly slower pace. The gable ends have be constructed and the roof is now fully insulated, the waterproof felt is going on between the bouts of high wind and rain. Next week, with luck, there might be some tiles on the roof and the trench to carry the electricity and water supply from Hill End lane will be dug. We apologise for the inevitable inconvenience this will cause and will minimise it as far as possible. Please bear with us.

Have a look at the Visitor Centre page for the gallery of photographs.

Leave a Reply

Your email address will not be published. Required fields are marked *